SUPFLEX & SUPERFLEX Manufacture
Design in U.S.A. Cupertino & Distribute to the whole world

Supflex and Superflex with its partners have extensive experience with Floats construction.  We understand the importance of a
good plan, a good design, and a repeatable process to specify the system, build components, inspection components, and
deliver the components to the work site for assembly.     

Overview of the Superflex Installation Process:

1.  Planning the Project and determine specifications
2.  Selection of anchors model and design the concrete anchor size shape and structure
3.  Delivery and setup of the Floats, Superflex stands, and mooring lines or chain with shackles
4.  Connection of whole system components
5.  Install every SuperFlex mooring line with initial pretension stress request , if it is meet the civil engineer design
calculation, after the 5 ~ 7 days of whole Install completed, or after hurricane attack, check & re-adjust it if necessary.
Offshore Mooring
Manufacture

2004 © American Marine, SUPFLEX® Germany, Patent No. 203.17.006.7 All Rights Reserved
2005 © American Marine, SUPFLEX® U.S. Patent No. 6,899,050 B1.  All Rights Reserved
2006 © American Marine, SUPFLEX® China Patent No. ZL 2003201005264 All Rights Reserved
2007 © American Marine, SUPFLEX® China Patent No. ZL 200520047348.2 All Rights Reserved
2012 © American Marine, SUPFLEX® U.S. Patent No. 7,651,299 B2.  All Rights Reserved
Superflex Nano Taut Elastic Mooring Strands Factory